Boleskine Cycling Improvements Project
The District of Saanich will be installing protected bike lanes on Boleskine and Harriet Roads, between Irma Street and Tennyson Avenue.
This installation will be combined with crosswalk and sidewalk improvements at the Boleskine-Harriet intersection, as well as paving work between Irma Street and Davidson Avenue.
Project overview
Boleskine Road is identified as a short-term bicycle network priority in the District’s Active Transportation Plan, and a key east–west cycling connection linking Harriet Road and Hampton Road to the Galloping Goose Regional Trail. The selection of protected bike lanes is based on existing vehicle volumes and speeds, improving safety for both cyclists and pedestrians by providing additional separation from vehicle traffic.
Why are we doing this?
This project will fill a gap in the cycling network as we work toward implementing the long-term network, enhance a corridor with a history of collisions, and upgrade the pedestrian crossing at Harriet Road—while strengthening regional connections. Overall, it supports a safer, more connected, and more balanced transportation network for all users.
Project Timeline
Construction Phase 1: May 2026
Phase 1 includes sidewalk improvements at the northwest corner of the Boleskine-Harriet intersection, at the east end of Hampton Road.

Construction Phase 2: TBD
This phase includes sidewalk and crosswalk improvements to the east side of the Boleskine-Harriet intersection, along with paving work, roadway markings, and installation of protected bike lanes between Irma Street and Davidson Avenue.
Project Map
Traffic impact
Construction crews will be on site daily during the construction period. Traffic delays are expected in order for the crews to safely carry out their work. While we aim to minimize disruption, single-alternating traffic may be in effect at times. Effort will be made to minimize inconvenience and maintain access for local residents and businesses.
⏱ Construction times are Monday - Friday, between 9 a.m. and 3:30 p.m.
Additional information
Project Manager: Cynthia Williams
For questions about this project, please reach out to engineering@saanich.ca.