Goward Bridge Repair

Current Progress Update

June 8, 2026

Test Right Rigging has been engaged to construct the repairs.

Construction Timing

Construction is anticipated to occur mid August 2026, to align with low water levels and environmental regulations. The contractor will provide a construction notification to impacted residents prior to the start of construction.

Goward Bridge Photos

Before Construction

Project Information

The bridge over Todd Creek at Goward Road requires repair. The pile tops, exterior timber stringers and railing system are deteriorating and will be replaced to ensure continued operation of the bridge.

Notifications Letters

Project Location

Project Status: Active

Project Phase: Pre-Construction

Budget: $100,000

Project Manager: Ashley Locke