Piedmont Drive Watermain Replacement Project
Start Date: September 2026
Completion Date: Mid-November 2026
What’s Happening?
The District of Saanich is undertaking utility upgrades on Piedmont Drive from Santa Clara Avenue to Del Monte Avenue. The scope of work includes the replacement of existing infrastructure including the watermain, fire hydrants, and service connections.
Why are we doing this?
The Water Supply Master Plan (circa 2022) identified fire flow deficiencies in the existing water distribution system along Piedmont Drive. The existing 100mm dia. cast iron main will be replaced by a 200mm dia. PVC main.
Construction Impacts:
During construction, work will take place between 8:00 am and 4:30 pm from Monday to Friday.
Vehicle access will be impacted by single lane alternating traffic and full closures depending on the work area. Some properties will have their driveway inaccessible for a short period of time. Saanich Public Works staff will notify residents of these occasions and try to accommodate any access concerns.
Traffic control personnel and signage will be in-place to help direct vehicles, cyclists, and pedestrians through and around the work areas.
Phased disruption to services in the area will occur during construction. Saanich Public Works will notify residents a minimum of 24 hours prior to any disruption of services. Waste collection and recycling services will be maintained.
Project Timeline:
Construction is expected to begin in September 2026 and last until mid-November 2026. This timeline is subject to change according to site specific conditions throughout construction.
Hello Saanich will be updated as the project progresses.
Phases
Construction
Duration: Construction is expected to begin in September 2026 and last until mid-November 2026. This timeline is subject to change according to site specific conditions throughout construction.