Uptown Douglas Pre-Zoning & Network Design Project
We want to hear from you!
Property owners, business operators, community groups and members of the public are invited to share their thoughts on the Uptown Douglas Pre-zoning and Network Design Project.
Contact Us
General UDP inquiries or feedback
E-mail: udp@saanich.ca
Gina Lyons, Senior Implementation Planner - Community Planning
E-mail: gina.lyons@saanich.ca
Phone: 250-475-5494 ext. 3429
Megan Squires, Strategic Projects Manager
Email: megan.squires@saanich.ca
Phone: 250-475-5494 ext. 3632
Project Overview
The Uptown Douglas Pre-Zoning and Transportation Network Design Project (the “Project”) is the next step in putting the Uptown Douglas Plan (UDP) into action. The UDP was approved by Council in 2022, and this follow-up project focuses on turning that long term vision into a regulatory framework.
Project Highlights
This project is the next step in transforming the area into the complete, people-oriented ‘heart’ of Saanich. This will be accomplished through:
- Encouraging development which enhances the area as a regional landmark
- Transforming Oak Street into a vibrant pedestrian high street that links Uptown Shopping Center to Mayfair Mall
- Creating a Future Park, bringing more green space for the community to enjoy.
- Creating a new lane, Audley Crossing, which will be a shared street providing access for pedestrians, cyclists and vehicles
- Supporting economic development in the area through development that provides a mix of employment uses
Project Timeline

Public consultation is underway to obtain feedback on the draft pre-zoning areas and transportation network design. The project will be refined following the completion and analysis of public consultation.
Public Engagement
Public engagement is ongoing until July 6, 2026. The engagement schedule is available below.
- Online Webinar #1, Thursday, June 4, 2026 from 7 - 8:30 p.m.
- Online Webinar #2, Friday, June 5, 2026 from 12 - 1:30 p.m.
- Open House, Thursday, June 11, 2026 from 4 - 8 p.m. at Saanich Municipal Hall (770 Vernon Avenue)
- Online Survey, Open from June 1 - July 6, 2026 on HelloSaanich.
It is strongly recommended that you attend an online webinar session or the open house before completing the survey.
Registration for webinars and open houses via HelloSaanich is recommended, but not required.
We encourage you to “Follow” at the top of our page to be kept informed about project updates.
Project Update – March 26, 2026
On March 23rd, staff presented an update on the progress of the Uptown-Douglas Pre-Zoning & Network Design Project to Council. The presentation included a review of the draft zoning and the draft transportation network design, along with pre-zoning implementation options and proposed amendments to the Uptown Douglas Plan. Council received the staff report for information and directed staff to:
- Revise the Terms of Reference for the Uptown-Douglas Pre-Zoning and Network Design Project to present property owners, within the pre-zoning area, with an opportunity to opt in to the rezoning of their properties and that the consultation include a car dealership specific meeting.
- Proceed to consultation on potential amendments to the Uptown-Douglas Plan that would: extend the Core land use designation to include properties along Blanshard Street; enable consideration of development up to 24-storeys along Blanshard Street and Douglas Street; and lower the base building in the Urban Mixed-Use designation from eight storeys to six storeys.
- Proceed to consultation on the land use framework and network design presented and include a range of options for potential Floor Space Ratio (FSR) exclusions within the Uptown-Douglas Plan (UDP), including, but not limited to the provision of such elements as: amenity space for residents, employment space, day care spaces, cycling amenities, and clinic/medical use.
The staff report and other project related information can be found through the links below:
Uptown Douglas Plan - Financial Feasibility Analysis Report (2026)

29 weeks left
Phases
Pre-Zoning Opt-In Process
Property owners have the opportunity to include their properties in the pre-zoning.
Upcoming and ongoing events

Event date: June 11th, 2026 at 11:00 PM to June 12th, 2026 at 3:00 AM.
6 registrants