Skip to main content

Before you participate

Authentication

Enter your email address to continue.

Or
The District of Saanich Home
  • Home
  • About
  • What's Coming Up?

We're here to listen.

Welcome to the participation platform of The District of Saanich

7752

7752 users
7752 participants

What we're working on:

Crosswalk Safety Review

A raised pedestrian sign

49 participants

49 participants

As part of our Road Safety Action Plan, the District of Saanich is conducting a community-wide crosswalk safety review, a technical study to help the District to understand the level of safety at midblock and uncontrolled crosswalks.

AMI Water Meter Upgrade Project

AMI Water Meter Upgrade Project

Tillicum Burnside Plan

87 participants

87 participants

The Tillicum Burnside Plan project has just commenced - learn more and get involved here.

Uptown Douglas Pre-Zoning & Network Design Project

40 participants

40 participants

The Uptown Douglas Plan is a comprehensive land use and transportation document with clear directions and policies to transform this area into mixed-use, walkable neighbourhoods over the next 20 to 30 years and that will collectively serve as the core, or heart, of Saanich.

Saanich Zero Waste Strategy

Saanich’s 2020 Climate Plan identified the need for a community wide zero waste strategy. The strategy will establish the vision, targets, and pathway necessary for Saanich to become a zero-waste community.

Climate Plan Update

203 participants

203 participants

The Climate Plan Targeted Update will tackle the challenges of local and global climate change mitigation and adaptation, by establishing updated targets, metrics and strategies and developing a five-year targeted action plan to achieve Saanich’s Climate Plan Goals.


Current Engineering Projects

Current Projects

57 projects

374 participants

374 participants

Find all of the current, upcoming and recently completed capital projects in the District of Saanich.

Elk Lake Drive/Pat Bay Highway Watermain Replacement Project

Watermain replacement on Elk Lake Drive between Marsett Place and the Beaver/Elk Lake Park entrance, and at the south end of Cherry Tree Bend, north end of Falaise Drive, and watermain lining on the Pat Bay Highway.

Boleskine Cycling Improvements Project

The District of Saanich is installing protected bike lanes on Boleskine Road and building an improved crosswalk and sidewalks at the Boleskine-Harriet intersection. Work also includes pavement resurfacing between Irma Street and Davidson Avenue.

Carey Road Sidewalk Upgrade

The Carey Road Sidewalk Upgrade project will deliver upgraded concrete sidewalks, curb drops, and related improvements to support safe and accessible travel for residents of all ages and abilities.

Hartland Bridge Replacement Project

The District of Saanich is undertaking a project to replace the existing timber frame bridge over Tod Creek on Hartland Road. This bridge serves as access to 48 rural properties, the public access to the Hartland Landfill as well as access to trail systems within the Mount Wor...

Foul Bay Road Sanitary Service Transfer Project

The District of Saanich will be replacing 34 sanitary sewer service connections along Foul Bay Road between Carnarvon Street and Cadboro Bay Road. Construction will start mid-August and last approximately 10 weeks.


Saanich Operations Centre Redevelopment Project

The Saanich Operations Centre – located at 1040 McKenzie Avenue – has served our community for more than 60 years. We want to redevelop the centre to provide services far into the future.
Learn more about the project

5 participants

5 participants

We’re listening! Your input helps guide our decision-making process.

Thank you for taking the time to register on HelloSaanich!

Your involvement in this process is invaluable to the future of our community.

  • Terms and conditions
  • Privacy policy
  • Cookie policy
  • Accessibility statement
  • Site Map
Powered byGo Vocal formerly CitizenLab
English
  • ਪੰਜਾਬੀ
  • 中文 (简体)
  • Français
  • Español