Skip to main contentSite map of the participation platform of The District of Saanich
General
Projects of The District of Saanich
All projectsUptown Douglas Pre-Zoning & Network Design Project - Survey
Interurban-Wilkinson Project
Wallace Drive Project
Boleskine Cycling Improvements Project
Chip Seal Paving 2026
Measuring Overheating in Multi-Unit Residential Buildings Project
Kathleen Street Storm Drain Upgrade Project
2026 Municipal Budget Engagement - Survey
Roof replacement at Gordon Head Recreation Centre Weight Room
Saanich Tree Protection Bylaw Updates
Neighbourhood Bikeways Identification and Prioritization
Outdoor Sports Field Strategy Round 2 Engagement
Lambrick Park Campus Renewal Project
Off-Street Parking and Loading Regulations Update
Shelbourne Valley Plan - Phase 4 Survey
Gorge Flood Adaptation
Panama Flats Concept Plan Update
Chip Seal Paving 2025
Tillicum Green Infrastructure & Climate Resiliency Project
Traffic Calming Policy
2025 Municipal Budget Engagement - Survey
2025 Municipal Budget Engagement - Simulation Tool
Tillicum Burnside Plan
Climate Plan Update
Quadra McKenzie Plan
Shelbourne Valley Plan
Saanich Operations Centre Redevelopment Project
Shelbourne Street Improvements Project
Uptown Douglas Pre-Zoning & Network Design Project
Current Projects
- More info
Admirals Road Water Upgrades
Albina Gorge Tillicum Upgrades
Albina-Maddock-Orillia Road Improvements
Belgrave Watermain Replacement
Brookleigh Road Culvert Replacement
Cadboro Bay Utility Replacement
Canterbury Road Watermain Replacement
Carey Road Drain Replacement
Carey Road Sidewalk Upgrade
Cedar Hill Cross Road Watermain Upgrade
Cedar Hill Road Watermain Replacement
Claremont Avenue Watermain Replacement
Colquitz Storm Drain and Sewer Upgrade
Cordova Bay-Lochside Slope Low Pressure Sewer and Storm System
Cordova Bay Road Improvement Project (Rambler Road to Walema Avenue)
Del Monte Avenue Watermain Replacement Project
Douglas Street Watermain Upgrade
Durrance Bridge Replacement Project
Elk Lake Drive/Pat Bay Highway Watermain Replacement Project
Grange Road Upgrades
Inez Storm and Sanitary Sewer Replacement
Iona, Broadmead and Kremlin Sidewalk Upgrade
Jamaica Road Right of Way (ROW) Storm and Sewer Upgrades
Jennifer Road and Doncaster Drive Traffic Calming and Safety Enhancement
Kenmore Tasco Utility Replacement
Lochside Drive Traffic Calming Upgrades
Maddock & Wascana - Storm Drain, Sanitary and Water Utility Upgrades
Mann Avenue - Protected Bike Lanes
Mortimer Street Sidewalk
Mount Tolmie Generator Upgrades
Pear Street Road Improvements
Piedmont Road Watermain Replacement Project
Prospect Lake Road Culvert Replacement
Reynolds Road Storm Sewer, Watermain, and Road Safety Upgrades
Reynolds Road Bike Lane Installation & Pavement Rehabilitation
Richmond Road Improvement Project (Bay St to Newton St)
Roy Road Storm and Sanitary Upgrades
Rutledge Road Watermain Replacement
Saanich-Short-Oak Sanitary Sewer Replacement
Seaton Regina Sidewalk
Sinclair Road Upgrades
Speed Limit Updates
Tattersall Drive - Storm, Sewer, & Water Upgrades
Tudor-Benson ROW Storm Drain Replacement
Tyndall Watermain Upgrade
Wilkinson Road Improvement Project (Greenlea Dr to Quicks Bottom Park Trail Xwalk)
Wray Creek Drainage Improvements
Urban Forest Strategy Action Plan
Energy and Carbon Emissions Reporting Requirement
Shelbourne Valley Action Plan Survey
Saanich Zero Waste Strategy
Custom pages